Ross Hall Hospital
Theatre 4 – Polyflor Pearlazzo PUR was supplied and installed. Pearlazzo PUR enables you to bring a special brand of style and elegance to any commercial environment, available in sheet in a palette of 24 contemporary colours, ranging from pale neutrals through to more intense shades, Pearlazzo PUR features a unique multi-flake decoration giving it a distinct appeal.
Within the refurbished Male & Female changing rooms, Altro Aquarius slip resistant sheet vinyl was used because of its suitability for lasting performance in wet and dry environments, shoes or barefoot – Achieving a fantastic slip resistance value for barefoot use – Altro Aquarius provides optimum protection in both wet and dry environments.
Over 300m2 of Gradus Genus sheet carpet was chosen for the Boardroom and Administration offices. Gradus Genus carpet offers exceptional performance across a variety of contract environments, Combining durability and ease of maintenance with high levels of styling.
Consulting Rooms, Offices and Patient Care areas received Forbo Eternal wood – The Eternal Wood collection contains a large variety of realistic wood designs and plank sizes, including some multi-width plank designs.



As approved flooring contractor for BMI, CarpetworksUK Ltd was asked to replace the worn carpet barrier mat to the main entrance of Ross Hall Hospital, Glasgow with a new sturdy aluminium mat.
Gradus Esplanade 12mm aluminium closed construction matting in “Jackdaw Black” was chosen as the new primary mat with Gradus Boulevard matting in “Jackdaw Black” as secondary matting installed carrying on into main reception.
A 10pm start – with a completion deadline of 7am – first we had to remove the old matting and then apply a latex screed to smooth floors for both mats. Arditex NA screed was used for this because of its high strength and fast drying capabilities.
As there was no existing well to take new matting, we had to cut and fix a new 12mm ramped edge trim at the main entrance and raise Boulevard mat secondary mat by fixing Gradus BU800 diminishing strip underneath to then butt against Esplanade mat to obtain the correct levels and remove any tripping hazards.
Gradus ramp edge trim was also fixed down both sides of Esplanade matting and Gradus TT35/AFT base plate and clip-top trims were cut, mitred and fixed around and between Boulevard matting and existing reception carpet.
As you can see, a lot of detail and materials were used in this small operation.
On completion, a quick hoover and tidy up and then exited the building at 4.30am – another quality job delivered on time.


